Monday, July 27, 2009

july 27

Today we were down a few people.

Erica was working on the writeup for the trash collector and was having issues with the odt and doc formats. She also worked on the code cheat sheets and props for the activity.

Fara concentrated most of her work today on the lego designer and a little bit of the code.

I(Chris) worked on the code for the prey and also looking into some integration problems with the movement code. There will need to be some refactoring of the code that connects to the movement code to allow both the ps2 controller and the robot commands to work with the different movement routines.

Brad focused on making sure his writeup was complete.