Monday, July 6, 2009

Monday July 6, 2009

Today, we had quite sporadic weather as usual.

Aside from that, Krista continued to work with Brad on the Segway bot. Brad worked with the gyroscope code to try to make his own, however, with all of the constants necessary for it to work correctly, Krista and Brad decided to use cars instead. They did put the segway in the designer, so if anybody has time and wants to mess with that, they can. They
Chris began to put the predator/prey bot into the Lego Designer. He is doing some model tweaking as he goes to make it better and easier.

Reza spoke with Chris at the beginning of the day to get information on what he was doing and what he had done this past week so he can get caught up. With that info, Reza began working on some code for the predator/prey bots. Today, he specifically worked on the communication code.

Erika and Fara had been working on the code with the grabber robot. They found that some of the original code did not work well, or work as well as they had hoped, so they decided to write some of their own. They will be working on this through tomorrow.